Go to: Main Content Go to: Navigation

Transport for London

Streets

Managing London's streets is one of Transport for London's (TfL's) main responsibilities. These documents give the background to some key street works projects.

Reports

Date

Design standards for signal schemes in London (PDF 1.5MB)  January 2012
Statement on the use of extra government funding to repair roads damaged by severe winter weather (PDF 475KB)
Letter from Phillip Hammond (PDF 96KB)
 September 2011
Traffic signals not in line with TfL's Signal Design standards (PDF 39KB)  June 2010
RNPR Traffic Note 3 TfL cordon and screenline surveys 1971-2008 (PDF 2.32MB)  Oct 2009
TLRN customer satisfaction survey (PDF 325KB)  Oct 2009
RNPR Traffic Note 9 Trends in cycling levels in London (PDF 5.72MB)  Sept 2009
RNPR Traffic Note 11 Cycle journey time reliability (PDF 5.31MB)  Aug 2009
A10 Stoke Newington Gyratory - implications of removing one-way system (PDF 1.83MB)  Dec 2008
Traffic Note 1 Traffic levels on major roads in Greater London 1993-2007 (PDF 5.79MB)  Nov 2008
RNPR Traffic Note 7 Weather conditions and the level of cycling on the TLRN (PDF 474.7KB)  May 2008
RNPR Traffic Note 5 Major and Minor traffic flows measured through TfL cordoned surveys (PDF 1.01MB)  Dec 2007
Highway Asset Management Plan (HAMP) (PDF 2.79MB)  Sep 2007
RNPR Traffic Note 8 Proportion of cyclists violating red lights (PDF 1.44MB)  June 2007
Technical Note 3 Total vehicle delay in London (PDF 1.39MB)  Apr 2006

Journey Planner

More options
You are here:
Business & partnersPublications

Elsewhere on tfl.gov.uk